Warning: scandir(/home/u765589166/domains/jpprofloor.com/public_html/wp-content/themes/thermnova/elements/widgets/): Failed to open directory: No such file or directory in /home/u765589166/domains/jpprofloor.com/public_html/wp-content/plugins/case-addons/inc/elementor/pxl-elementor.php on line 305

Warning: scandir(): (errno 2): No such file or directory in /home/u765589166/domains/jpprofloor.com/public_html/wp-content/plugins/case-addons/inc/elementor/pxl-elementor.php on line 305

Warning: foreach() argument must be of type array|object, bool given in /home/u765589166/domains/jpprofloor.com/public_html/wp-content/plugins/case-addons/inc/elementor/pxl-elementor.php on line 307

JP Profloor & Cleaning Services

A distribution center lost heat every time the dock doors opened, and the floor was cold while warm air collected under the roof.

The operator needed steady temperatures for staff and stock without stopping the three shifts.

Our solution included:

  • Twenty-two high-efficiency unit heaters replaced zone by zone.
  • Large destratification fans push warm air back down to the floor.
  • Dock door heaters recover temperature quickly after loading.
  • A 24/7 service agreement with a four-hour response target.

Floor temperatures are now within three degrees across the building and gas use dropped by 31%.