JP Profloor & Cleaning Services
A distribution center lost heat every time the dock doors opened, and the floor was cold while warm air collected under the roof.
The operator needed steady temperatures for staff and stock without stopping the three shifts.
Our solution included:
Floor temperatures are now within three degrees across the building and gas use dropped by 31%.